Search found 31 matches

by dasubbotin
Sun May 05, 2019 7:28 pm
Forum: EET-265L Lab - Evening
Topic: Week #15: (4/29-5/3) Progress Reports, Inductive Prox Sensor
Replies: 5
Views: 3468

Re: Week #15: (4/29-5/3) Progress Reports, Inductive Prox Sensor

A couple of us came in on the off-day, Thusday night to play with Raspberry Pi and get a barcode scanner working. It was interesting to see and learn about what this little compute is and what it is capable of, how it is its own computer with it's own operating system and applications. We cannibaliz...
by dasubbotin
Wed May 01, 2019 9:14 pm
Forum: EET-265L Lab - Evening
Topic: Week #15: (4/29-5/3) Progress Reports, Inductive Prox Sensor
Replies: 5
Views: 3468

Re: Week #15: (4/29-5/3) Progress Reports, Inductive Prox Sensor

Today, more good progress was made. Vinnie had installed output relays overnight. Most importantly Rob with Dave's help got the Motion Block working figured out. Now we need to program relative motion and figure out the assigned positions that will be needed for the cup positions. Ricky and Michelle...
by dasubbotin
Mon Apr 29, 2019 6:03 pm
Forum: EET-265L Lab - Evening
Topic: Week #15: (4/29-5/3) Progress Reports, Inductive Prox Sensor
Replies: 5
Views: 3468

Re: Week #15: (4/29-5/3) Progress Reports.

Not sure where my first post went, but here's the second one. This was our second class this week, on April 24. Today, Vinny installed Panduit on the backpanel, which made the wiring look very organized and nice. A front panel was then mounted along with a makeshift belt tensioner that worked well. ...
by dasubbotin
Mon Apr 22, 2019 8:51 pm
Forum: EET-265L Lab - Evening
Topic: Week #14: (4/22-26) Progress Reports.
Replies: 1
Views: 1756

Re: Week #14: (4/22-26) Progress Reports.

On Monday (extra day of class), Vinnie mounted another strut, pump mountings & pumps, and bolted down the rotary base, not to mention a din rail to hold the PLC on the backboard, and we also mounted the DC stepper driver unit. We met in the backroom to compile a list of all parts we wanted to mo...
by dasubbotin
Mon Apr 22, 2019 8:47 pm
Forum: EET-265L Lab - Evening
Topic: Week #13: (4/15-19) Progress Reports
Replies: 2
Views: 2132

Re: Week #13: (4/15-19) Progress Reports

This week, John brought in the 3d printed cup holder and metal fabricated drink dispenser actuator head for the air solenoid. It should work great, although it may need to be stabilized from spinning in place. It seemed that 25 lbs of force was proper for confident actuation. The 4.2A, 24V DC steppe...
by dasubbotin
Mon Apr 22, 2019 8:21 pm
Forum: EET-265L Lab - Evening
Topic: Week #13: (4/15-19) Progress Reports
Replies: 2
Views: 2132

Re: Week #13: (4/15-19) Progress Reports

Here is a Parts List for mounting on the backboard:
* Power Supply: 120 VAC-to-240 VDC
* Power Supply: 120 VAC to 12 VDC
* 1 Dobot Voltage driver chip
* 6 Cube relays (to switch 2 Air solenoids & 4 pumps)
* One or more Terminal Block
* DC Stepper Motor
* 6 Din Rail Mounted Fuses
* Panduit
by dasubbotin
Wed Apr 17, 2019 6:44 pm
Forum: EET-265L Lab - Evening
Topic: Week #12: (4/8-12) Progress Reports.
Replies: 1
Views: 1786

Re: Week #12: (4/8-12) Progress Reports.

This week, Vinnie had installed the heavy duty swivel base and cut the 3.5in pipe dies into the top circular plate to hold the bottles steady. He glued the thin belt to the wooden rotor base. We mounted the stepper motor to the back display wall. We also took measurements to ensure the proper center...
by dasubbotin
Wed Apr 17, 2019 6:05 pm
Forum: EET-265L Lab - Evening
Topic: Week #11: (4/1-5) Progress Reports
Replies: 3
Views: 2586

Re: Week #11: (4/1-5) Progress Reports

This week, Rick's DC motor arrived along with a mounting bracket. We tested it with the worm/ring gear and found that it presented challenges keeping the gears mated. We experimented with plan A for spinning the rotor by using a belt based solution, but using electrical tape as a proxy. This worked ...
by dasubbotin
Mon Apr 01, 2019 7:33 pm
Forum: EET-265L Lab - Evening
Topic: Week #9: (3/18-22) Progress Reports
Replies: 3
Views: 2586

Re: Week #9: (3/18-22) Progress Reports

After lecture, we brainstormed on our system's needed parts and began to spec them out and search for availability on Amazon primarily. We found a 100 rpm DC motor, which we liked in combo with a worm gear/ring. We calculated that the torque and ultimate gear reduction was in our ballpark and the to...
by dasubbotin
Mon Apr 01, 2019 7:23 pm
Forum: EET-265L Lab - Evening
Topic: Week #10: (3/25-29) Progress Reports
Replies: 2
Views: 2133

Re: Week #10: (3/25-29) Progress Reports

This week we discussed the status of orders on needed parts, and whether anything could be done to try and expedite them. In the absence of these parts, we rehashed our overall structural and physical setup and placement of major components of the system, where things would go, and modifications tha...
by dasubbotin
Wed Jan 30, 2019 8:29 pm
Forum: EET-265L Lab - Evening
Topic: Week #2: (1/28-2/1) Progress Reports
Replies: 5
Views: 3296

Re: Week #2: (1/28-2/1) Progress Reports

Wed:1/30: Tonight we discussed the pros/cons of various project ideas and decided on the one we wanted. We chose to do the Automated Adult Beverage Dispenser. This option seems to involve or make available many learned concepts such as: -Robotics, Pneumatics/Hydraulics, Temp Regulation, Calculations...
by dasubbotin
Sun May 06, 2018 8:43 pm
Forum: EET-255 Advanced Topics in EET/Automation
Topic: End of Year Assignment - Spring 2018 Evening Class
Replies: 9
Views: 4399

Re: End of Year Assignment - Spring 2018 Evening Class

Hi Rick,

I've completed the final assignment and forwarded it to you via the student email account.

-Dave S.
by dasubbotin
Sun Apr 29, 2018 6:54 pm
Forum: EET-255 Advanced Topics in EET/Automation
Topic: End of Year Assignment - Spring 2018 Evening Class
Replies: 9
Views: 4399

Re: End of Year Assignment - Spring 2018 Evening

Hi,

I'm beginnig the final assignent.

-Dave S.
by dasubbotin
Sun Mar 04, 2018 7:44 pm
Forum: EET-255 Advanced Topics in EET/Automation
Topic: Week #5: (2/20-23) Online Collaboration, Google Docs
Replies: 2
Views: 2210

Re: Week #5: (2/20-23) Online Collaboration, Google Docs,

Hi Rick, I'm read up for this week. Google's online collaboration is pretty cool. I like the live chat option within the document.
-Dave
by dasubbotin
Thu Dec 14, 2017 9:16 pm
Forum: EET-260 Lab
Topic: Completion of PDB experiments
Replies: 0
Views: 1907

Completion of PDB experiments

Rick,

I've completed all the Professional Development Board Kit experiments, except for:
Experiment #31: Advanced 7-Segment Multiplexing*
Experiment #32: IC2 Communications*
Experiment #33: Using A Real-Time Clock

-Dave Subbotin
by dasubbotin
Tue Dec 12, 2017 7:45 pm
Forum: EET-260 Lab
Topic: Week #13: (11/28) Truth Table Programming
Replies: 2
Views: 1919

Re: Week #13: (11/28) Truth Table Programming

Rick,

Lab has been completed, flow chart and program submitted in person.

-Dave S.
by dasubbotin
Mon Dec 11, 2017 8:16 pm
Forum: EET-260 Lab
Topic: Week #7: (10/17) BS2 IO Signals
Replies: 3
Views: 2297

Re: Week #7: (10/17) BS2 IO Signals

Rick,

This is complete.

-Dave

Go to advanced search