Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post Reply
rjagodowski
Posts: 2380
Joined: Fri Sep 04, 2015 6:59 pm

Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by rjagodowski »

This week you should be working on the content in Chapter 6 in the Parallax Process Control text. A pdf of Chapter 6 is attached here for your convenience:
Process-Control-Text-Chapter 6_v1.0.pdf
(1.85 MiB) Downloaded 224 times
The incubator circuit you will build today will be used for the remaining exercises in the text. Here are the schematics and layout for the circuits:
Ch. 6 & 7 Incubator Schematic & Layout.pdf
(719.27 KiB) Downloaded 201 times
It is recommended that you construct it on a protoboard you will not need for the rest of the semester. You can build it directly on your BoeBot board OR you can build it on a small separate protoboard. See your instructor for an additional protoboard if that is your preference.


You should post your screendshot of the Stampplot Graph created with the IncubatorOpenLoop.bs2 program and the StampPlot macro sic_pc_incubator_open_loop.spm. Your graph should look similar to the graph of Fig. 6-23 on page 216:
Fig. 6-23 Stampplot Open-Loop Control.jpg
Fig. 6-23 Stampplot Open-Loop Control.jpg (301.28 KiB) Viewed 4940 times
tddejesus

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by tddejesus »

Thomas DeJesus Week #12, process control ch.6 complete.
250 chap6 incubator week 12.JPG
250 chap6 incubator week 12.JPG (186.07 KiB) Viewed 4927 times
crbrooks-bouchar0001

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by crbrooks-bouchar0001 »

Week 12 Chap. 6 Complete
Attachments
250 chap6 incubator week 12.JPG
250 chap6 incubator week 12.JPG (186.07 KiB) Viewed 4925 times
ajjorge

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by ajjorge »

lab completed
Attachments
Ch#6.JPG
Ch#6.JPG (185.25 KiB) Viewed 4911 times
ljbaker0001

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by ljbaker0001 »

Complete week 12, chap #6
Attachments
Ch#6.JPG
Ch#6.JPG (185.25 KiB) Viewed 4910 times
yakgun

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by yakgun »

week #12 is complete
Attachments
cpt6.JPG
cpt6.JPG (181.64 KiB) Viewed 4909 times
aakhider

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by aakhider »

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.
Inc_On_Off.jpg
Inc_On_Off.jpg (75.27 KiB) Viewed 4906 times
aakhider

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by aakhider »

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.
Attachments
Inc_On_Off42016.JPG
Inc_On_Off42016.JPG (202.71 KiB) Viewed 4903 times
aakhider

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by aakhider »

Re: Week #12: (4/11-15) Chapter 6 in Paralla
Attachments
Inc_Open_loop.JPG
Inc_Open_loop.JPG (201.41 KiB) Viewed 4898 times
Inc_Open_loop.JPG
Inc_Open_loop.JPG (201.41 KiB) Viewed 4898 times
Inc_Open_loop.JPG
Inc_Open_loop.JPG (201.41 KiB) Viewed 4898 times
wgonzalez7074

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by wgonzalez7074 »

Week #12: (4/11-15) Chapter 6 in Parallax Process Control text,
has been completed.
Copy of Inc_Open_loop.JPG
Copy of Inc_Open_loop.JPG (199.86 KiB) Viewed 4896 times
ybespalov09

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by ybespalov09 »

Lab-Week#12: Chapter 6 is complete.
Attachments
PWM_Open_Loop_Control.jpg
PWM_Open_Loop_Control.jpg (461.27 KiB) Viewed 4016 times
vlevchyk

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by vlevchyk »

Chapter 6 IS completed
Attachments
ch 6.png
ch 6.png (259.62 KiB) Viewed 4016 times
btenerowicz1

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by btenerowicz1 »

week # 12 completed
Attachments
stamplot 6.JPG
stamplot 6.JPG (188.17 KiB) Viewed 4016 times
mjhowe0001

Re: Week #12: (4/11-15) Chapter 6 in Parallax Process Control text.

Post by mjhowe0001 »

completed 6
Attachments
Screen Shot 2016-05-19 at 11.56.04 AM.png
Screen Shot 2016-05-19 at 11.56.04 AM.png (197.35 KiB) Viewed 4006 times
Post Reply

Return to “EET-250 Lab”