This week you should be working in the Process Control text Chapter #7.
There will be designated computers in the lab which will have StampPlot loaded on them. Please do NOT shut these computers off.
You should take a screen shot of each unique StampPlot screen/macro and post them in the form of a reply to this Topic.
(NOTE: There apparently has been some success installing StampPlot in Windows 10. However, you must set the Compatibility to "Win XP SP3" and set to "Run as Administrator". Then, click on the Desktop Icon to launch the program. After the program loads, then go to the "Macro" pull down menu and select the proper Macro to run. If you just click on the Macro to open and run StampPlot, then there seems to be a problem with Windows setting the proper compatibility mode. You can download StampPlot here. )
Make sure you put your Process Control Parts Kit back in the designated box when you are through.
Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
-
- Posts: 2370
- Joined: Fri Sep 04, 2015 6:59 pm
Re: Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
Lab Completed!
- Attachments
-
- Inc_On_Off_04-20_at_13-22-57.jpg (280.99 KiB) Viewed 2636 times
-
- Inc_On_Off_Delay.jpg (288.4 KiB) Viewed 2636 times
Re: Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
lab done
- Attachments
-
- Inc_On_Off_04-20_at_13-22-57.jpg (280.99 KiB) Viewed 2635 times
-
- Inc_On_Off_Delay.jpg (288.4 KiB) Viewed 2635 times
Re: Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
Lab 7
- Attachments
-
- Inc_On_Off.jpg (74.72 KiB) Viewed 2622 times
-
- Inc_On_Off2.jpg (107.97 KiB) Viewed 2622 times
Re: Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
Lab Complete
- Attachments
-
- 7-11.jpg (415.84 KiB) Viewed 2620 times
-
- 7-12.jpg (427.69 KiB) Viewed 2620 times
Re: Experiment #11: (Wk #12, 4/10-14) Process Control Chapter #7
Completed 4/27
- Attachments
-
- E11_Ch7a.png (213.04 KiB) Viewed 2600 times
-
- E11_Ch7b.png (203.68 KiB) Viewed 2600 times