Week #1: (1/22-26) Project Selection
-
- Posts: 2382
- Joined: Fri Sep 04, 2015 6:59 pm
Week #1: (1/22-26) Project Selection
This is where you should post your individual progress reports for Week #1.
-
- Posts: 61
- Joined: Tue Sep 12, 2017 11:37 am
Re: Week #1: (1/22-26) Project Selection
Looking up different ideas for our PLC program for the 4 fl elevator.
Good housekeeping, sterilizing was talked about with the team and I've brought the items for that.
Fernando.
Good housekeeping, sterilizing was talked about with the team and I've brought the items for that.
Fernando.
-
- Posts: 45
- Joined: Tue Sep 13, 2016 2:41 pm
Re: Week #1: (1/22-26) Project Selection
Did basic research on what's needed for the project and what's best suited to build the structure.
JoseL.
-
- Posts: 55
- Joined: Wed Oct 05, 2016 10:16 am
Re: Week #1: (1/22-26) Project Selection
Made an assembly diagram and a list of all the components required for the project.
-
- Posts: 27
- Joined: Tue Sep 12, 2017 11:50 am
Re: Week #1: (1/22-26) Project Selection
we looked in the project room and found some conveyor belts and motors to use. we also sketched an assembly line.
-
- Posts: 48
- Joined: Tue Sep 13, 2016 2:49 pm
Re: Week #1: (1/22-26) Project Selection
Talking about ideas on the elevator. Assigned task is to be in 3D printing. Decided on a frame and support for the elevator.
-
- Posts: 22
- Joined: Tue Sep 12, 2017 12:06 pm
Re: Week #1: (1/22-26) Project Selection
Malachi Vivenzio. Discussions about the elevator project as well as role assignments. Picked up some supplies for schematics.
-
- Posts: 26
- Joined: Thu Oct 27, 2016 2:34 pm
Re: Week #1: (1/22-26) Project Selection
Researched Elevator motors, brakes and door controls.
Re: Week #1: (1/22-26) Project Selection
Worked on plc program, researched elevator codes of conduct.
-
- Posts: 56
- Joined: Thu Sep 21, 2017 11:59 am
Re: Week #1: (1/22-26) Project Selection
Did research on elevators and how they work