Please post your Week #4 Progress reports as a reply to this topic.
flrosado0001
Posts: 61
Joined: Tue Sep 12, 2017 11:37 am

Re: Week #4: (2/12-16) Progress Reports

Post by flrosado0001 »

Worked on wiring the elevators hoist motor with the 24v relays. It moved CW then CCW perfectly. Then connected to the plc/hmi and it worked perfectly too.

Fernando
Attachments
4182BDA0-78CF-4889-AE3A-B0DC956BE3B5.jpeg
4182BDA0-78CF-4889-AE3A-B0DC956BE3B5.jpeg (1.51 MiB) Viewed 3811 times
npgrenier0001
Posts: 56
Joined: Thu Sep 21, 2017 11:59 am

Re: Week #4: (2/12-16) Progress Reports

Post by npgrenier0001 »

Wired the elevator motor, to get the CW and CCW directions, then connected the plc to get the CW and CCW directions
ajjanczulewicz0001
Posts: 48
Joined: Tue Sep 13, 2016 2:49 pm

Re: Week #4: (2/12-16) Progress Reports

Post by ajjanczulewicz0001 »

helped sautering a possible door mechanism by using a stepper motor... deciding on materials for frame
mhau
Posts: 42
Joined: Tue Sep 13, 2016 2:39 pm

Re: Week #4: (2/12-16) Progress Reports

Post by mhau »

Worked on car design and edited a couple settings. Researched door mechanics.
asingh0001
Posts: 55
Joined: Wed Oct 05, 2016 10:16 am

Re: Week #4: (2/12-16) Progress Reports

Post by asingh0001 »

Collaborated the sensor and motor with the help of PLC for cheese grater station.
Amrit
jmllabaly0001
Posts: 45
Joined: Tue Sep 13, 2016 2:41 pm

Re: Week #4: (2/12-16) Progress Reports

Post by jmllabaly0001 »

finished working on the plc up/down program and found the supplies needed for the structure.
Attachments
IMG_5710.JPG
IMG_5710.JPG (1.37 MiB) Viewed 3790 times
JoseL.
mafitzgerald0001
Posts: 26
Joined: Thu Oct 27, 2016 2:34 pm

Re: Week #4: (2/12-16) Progress Reports

Post by mafitzgerald0001 »

Took CD drive apart, soldered leads to motor for use on the elevator door