Worked on 3-D printing the parts for the elevators, discussed construction ideas and elevator door operation
mhau
Posts: 42
Joined: Tue Sep 13, 2016 2:39 pm

Re: Week #5: (2/20-2/23) Progress Reports

Post by mhau »

Researched shaft design and elevator car design.
flrosado0001
Posts: 61
Joined: Tue Sep 12, 2017 11:37 am

Re: Week #5: (2/20-2/23) Progress Reports

Post by flrosado0001 »

Worked on wiring the prox sensor, interfacing it with the plc and hmi, and interfacing the IR sensor with the plc.

Fernando Rosado.
asingh0001
Posts: 55
Joined: Wed Oct 05, 2016 10:16 am

Re: Week #5: (2/20-2/23) Progress Reports

Post by asingh0001 »

Tried to build the sauce station using valves and capacitive sensors, which was a FAIL! Brainstorming new ideas and went to home depot with the group for exploring possible parts that could be used for building the sauce station.
Amrit
ajjanczulewicz0001
Posts: 48
Joined: Tue Sep 13, 2016 2:49 pm

Re: Week #5: (2/20-2/23) Progress Reports

Post by ajjanczulewicz0001 »

Researched different door opening mechanisms for the door that we are going to use.
mafitzgerald0001
Posts: 26
Joined: Thu Oct 27, 2016 2:34 pm

Re: Week #5: (2/20-2/23) Progress Reports

Post by mafitzgerald0001 »

worked on door motor as well as looking into door design and placement