Week #12: (4/9-13) Progress Reports.

This is where you should post your weekly progress reports. Posts should be individual for each member of each group. You should post at least once per week. You may find it convenient to post more than one per week. That is acceptable.
Locked
rjagodowski
Posts: 2370
Joined: Fri Sep 04, 2015 6:59 pm

Week #12: (4/9-13) Progress Reports.

Post by rjagodowski »

Post your progress reports for Week #12 here.
ajjanczulewicz0001
Posts: 48
Joined: Tue Sep 13, 2016 2:49 pm

Re: Week #12: (4/9-13) Progress Reports.

Post by ajjanczulewicz0001 »

Cutting the glass for the cart and designing the teeth to catch on the bottom of the elevator door
flrosado0001
Posts: 61
Joined: Tue Sep 12, 2017 11:37 am

Re: Week #12: (4/9-13) Progress Reports.

Post by flrosado0001 »

Wired up the LED Buttons/figuring out the color coding on them.
Labeled the I/O wiring from the PLC's module.
Worked on more ideas for an elevator door.
Interfaced the PLC with a 12VDC motor instead of a 24VDC motor.
Found a better fit of a Prox senor. (Better distance).

Fernando. R.
jmllabaly0001
Posts: 45
Joined: Tue Sep 13, 2016 2:41 pm

Re: Week #12: (4/9-13) Progress Reports.

Post by jmllabaly0001 »

Found out the 24volt motor was too powerful for the shaft, it was adding to much force on the up/down functions but we found a 12volt motor that worked perfectly. discussed on either to add a Prox. Sensor to either the bottom of the cart or on the side to read floors when moving up and down. Also added "elevator" music to the voice chip.
JoseL.
asingh0001
Posts: 55
Joined: Wed Oct 05, 2016 10:16 am

Re: Week #12: (4/9-13) Progress Reports.

Post by asingh0001 »

Wired all the sensors for stations and did PLC Programming.
Amrit
sjcastillo
Posts: 29
Joined: Tue Sep 26, 2017 10:20 am

Re: Week #12: (4/9-13) Progress Reports.

Post by sjcastillo »

Overall , the concept of demonstrating the all section working with photo eyes seem to work.
npgrenier0001
Posts: 56
Joined: Thu Sep 21, 2017 11:59 am

Re: Week #12: (4/9-13) Progress Reports.

Post by npgrenier0001 »

Wired up the led buttons, and cut out the plexiglas sheets for the elevator sides
mhau
Posts: 42
Joined: Tue Sep 13, 2016 2:39 pm

Re: Week #12: (4/9-13) Progress Reports.

Post by mhau »

Redesgined motor and shaft adapter, assembled elevator car, and designed upper door assembly.
Locked