Week #12: (11/19-21) SCR Operation

Locked
rjagodowski
Posts: 2368
Joined: Fri Sep 04, 2015 6:59 pm

Week #12: (11/19-21) SCR Operation

Post by rjagodowski »

This week you will perform the short experiment below using an SCR (Silicon Controlled Rectifier). A pdf of the experiment can be downloaded here in the Registered Users Only area. Copies will be provided for you & distributed in class on 11/20.

A pinout of the SCR and its datasheet are supplied below.
2N5064_SCR_pinout.jpg
2N5064_SCR_pinout.jpg (35.03 KiB) Viewed 3336 times
Use the #7328 bulb in place of the #47 bulb in the schematic. The #47 requires a socket, the #7328 will plug right into the protoboards. These bulbs are located in the component drawers near the IC's, transistors & pots.

When you complete this experiment, make a progress report post in the form of a Reply to this topic.
2n5060_series.pdf
(322.53 KiB) Downloaded 139 times
2N5064_SCR_datasheet.pdf
(358.21 KiB) Downloaded 149 times
ctboutin0001
Posts: 63
Joined: Mon Sep 18, 2017 9:18 am

Re: Week #12: (11/19-21)

Post by ctboutin0001 »

I have completed the lab for today.
almarafuga0001
Posts: 60
Joined: Fri Sep 15, 2017 9:18 am

Re: Week #12: (11/19-21)

Post by almarafuga0001 »

I have completed the lab for this week
vshostak
Posts: 45
Joined: Mon Sep 10, 2018 1:48 pm

Re: Week #12: (11/19-21) SCR Operation

Post by vshostak »

Lab complete
nsrogers0001
Posts: 22
Joined: Wed Sep 13, 2017 12:29 pm

Re: Week #12: (11/19-21) SCR Operation

Post by nsrogers0001 »

I completed this lab. - Nick Rogers
mlgiguere0001
Posts: 32
Joined: Wed Dec 16, 2015 2:42 pm

Re: Week #12: (11/19-21) SCR Operation

Post by mlgiguere0001 »

Completed
nmwinston-corrad0001
Posts: 18
Joined: Tue Sep 12, 2017 5:24 pm

Re: Week #12: (11/19-21) SCR Operation

Post by nmwinston-corrad0001 »

Completed
Locked

Return to “EET-200 Lab”