This week will be the introduction to using the Basic Stamp and the Parallax Process Control text.
The lab sheet for this week's lab is here:
Here's the parts list from page 312 of the text:
Here is the parts list of all of the components which should be in the kit:
When you finish this exercise, make a post in the form of a Reply to this topic stating you have completed the assignment. Upon completion of this exercise you should have a parts kit with all components (or a list of the component needed) and have completed Chapters 1 & 2 in the Parallax Process Control text.
The Parallax Process Control text can be downloaded directly from Parallax, but you are better off to use the version attached here as this contains the combined text with the errata file. (The original text and errata file are available at the end of this post if you insist on using those.)
Here is the link where you can download the Process Control Example Code.
Here's the link to download the StampPlot software needed for many of the exercises. Be sure to download the proper version for your operating system. Version 3 Release 8.5 is for Vista/Win7/Win8 and Version 3 Release 7.5 is for Windows XP.
You will also need the StampPlot Macros or here:
Here is a pdf of just Chapter 3 of the Process Control Text which will be your assignment for next week (Week #7):
The two documents below are the original Process Control text and the accompanying Errata file.
Week #6: (2/25-3/1) Introduction to Parallax Process Control - Week #1
-
- Posts: 2383
- Joined: Fri Sep 04, 2015 6:59 pm
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control
I have completed the introduction lab
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control
Lab Complete DJ 03/19/19
-
- Posts: 63
- Joined: Mon Sep 18, 2017 9:18 am
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control - Week #1
I have completed the first two chapters. Here are some screenshots from chapter 2.
- Attachments
-
- boe.PNG (218.41 KiB) Viewed 4530 times
-
- bot.PNG (213.48 KiB) Viewed 4530 times
-
- Posts: 42
- Joined: Tue Sep 11, 2018 12:50 pm
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control - Week #1
Completed!!!
- Attachments
-
- boe.PNG (218.41 KiB) Viewed 4527 times
-
- bot.PNG (213.48 KiB) Viewed 4527 times
-
- Posts: 54
- Joined: Mon Sep 25, 2017 10:29 am
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control - Week #1
I have completed the lab for this week.
- Attachments
-
- boe.PNG (218.41 KiB) Viewed 4526 times
-
- bot.PNG (213.48 KiB) Viewed 4526 times
-
- Posts: 60
- Joined: Fri Sep 15, 2017 9:18 am
Re: Week #6: (2/25-3/1) Introduction to Parallax Process Control - Week #1
I have completed up to chapter 2, here are the screenshots.
- Attachments
-
- boe[3].PNG (218.41 KiB) Viewed 4525 times
-
- bot[3].PNG (213.48 KiB) Viewed 4525 times