Datasheet for optical sensor used on Credit Card Detector circuit (Omron E3S-AD11):
e3s-a_ds_e_11_1_csm1296.pdf
(4.33 MiB) Downloaded 169 times
rlafleche0001
Posts: 5
Joined: Wed Jan 30, 2019 8:14 pm

Re: Week #16: (5/6-10) Sensors Review & Project Discussion

Post by rlafleche0001 »

This is the updated version of the program

HMI has minimal features.
home dobot
home stepper
choose all 4 sodas
choose all 4 type of other liquids, while actuation the air cylinder on a tonoff timer.
Attachments
micro850_Test_5_5_19.rar
(1.64 MiB) Downloaded 156 times
jfrusso0001
Posts: 6
Joined: Thu Jan 25, 2018 6:12 pm

Re: Week #16: (5/6-10) Progress Reports

Post by jfrusso0001 »

On 5/6/2019 we were able to successfully command the robot through the PLC and control the stepper motor to each position. We also mounted the shot actuator cylinder and verified that it worked correctly.

We also decided to remove the "cup in place" sensor and instead just use the ultrasonic sensor that is mounted about the cup at the soda station. The ultrasonic sensor was tuned to be able to detect a cup in place and to determine when the cup is full.
mlgiguere0001
Posts: 32
Joined: Wed Dec 16, 2015 2:42 pm

Re: Week #16: (5/6-10) Progress Reports

Post by mlgiguere0001 »

As I said I would, I discussed the PLC program with Chuck on Tuesday. We had some ideas in which are sketched out that I am attaching. Basically, it gives the customer the ability to customize their order and will not start until their full selections are made and then reset, etc.
the idea has three selections: soda, mix, and ice and which they want or not want, etc. I will let you all check it out, hopefully, it will be helpful and maybe spawn some ideas and thoughts :)


Got a great suggestion for a master override for the barcode scanner. I wired it in on Input 15
Attachments
SeniorProjectPLCideas.pdf