Week #2: (1/28-2/1) Progress Reports

Post Reply
rjagodowski
Posts: 2380
Joined: Fri Sep 04, 2015 6:59 pm

Week #2: (1/28-2/1) Progress Reports

Post by rjagodowski »

You should post your progress for this week as a Reply to this Topic. Each person in your group should create their own post. You may edit your post as you work progresses throughout the week. For example:

Tuesday (1/29): I created the rough schedule for the group for the rest of the semester.

then edit the post on Thursday to add:

Thursday (1/31): I researched materials for the pneumatic control valves needed.

And if you work again later in the week:

Saturday (2/1): Found 3 vendors for the pneumatic control valves.

Progress Report Topics will be locked at the beginning of the next week. DO NOT DELAY IN POSTING YOUR PROGRESS!!!
ctboutin0001
Posts: 63
Joined: Mon Sep 18, 2017 9:18 am

Re: Week #2: (1/28-2/1) Progress Reports

Post by ctboutin0001 »

Tuesday: 1/29/19 We, as a group, moved our project onto its new table. We attempted to communicate with the plc, but we were not successful yet. Lastly we discussed a few different tasks and mentioned who would be doing each task.

Thursday: 1/31/19 we flipped around our design to how we want it on the table. we ran in a problem with the dobot gripper, so we did some research and came up with a bracket idea to mount it a different way to solve the issue.
Last edited by ctboutin0001 on Thu Jan 31, 2019 12:09 pm, edited 1 time in total.
almarafuga0001
Posts: 60
Joined: Fri Sep 15, 2017 9:18 am

Re: Week #2: (1/28-2/1) Progress Reports

Post by almarafuga0001 »

Tuesday (1/29): We cleaned out the spare room, and moved our project onto a better table so we will have more room to work with. Also figured out a schedule for our project and assigned jobs to each person.

Thursday (1/31): Today we moved our project around into the correct positions however, we ran into a problem with our project because our robot doesn't have the ability to move its wrists, so we worked on figuring out a solution but have not yet came to a conclusion.
crlapan
Posts: 56
Joined: Tue Sep 12, 2017 10:19 am

Re: Week #2: (1/28-2/1) Progress Reports

Post by crlapan »

Tuesday: 1/29/19 Our group deconstructed and moved our project onto its new table(resting area). We helped clean out the spare room. We attempted to communicate with the plc to try and pull the program out of it, but we were not successful yet. Lastly we discussed a few different tasks and mentioned who would be doing each task.

Thursday: 1/31/19 We as a group, rearranged our design on the table, to accommodate our audience. This move would allow the viewers/audience to be able to press buttons on the HMI. We ran into a slight problem with the dobot gripper, so we did some research and came up with a bracket idea that would allow us to mount it differently, hopefully giving us a solution to this issue. We broke off individually to work on our schedule, and do any more research we needed to do. HERE IS A LINK TO SCHEDULE ROUGH DRAFT
2019 Project Schedule.pdf
(119.72 KiB) Downloaded 170 times
ajfranqui0001
Posts: 54
Joined: Mon Sep 25, 2017 10:29 am

Re: Week #2: (1/28-2/1) Progress Reports

Post by ajfranqui0001 »

Tuesday (1/29): we cleaned out around for more space and we move the project to a better table. we still trying figured out a schedule for our project and assigned jobs to each person.


Thursday (1/31): we move our project to the correct positions but however we ran into a slighted problem with our project the new robot does not have the ability to move the way we want it. so we gonna do so research to figured out a solution.
rgomez0001
Posts: 42
Joined: Tue Sep 11, 2018 12:50 pm

Re: Week #2: (1/28-2/1) Progress Reports

Post by rgomez0001 »

Tuesday: 1/29/19 We moved our project toa few new table until we found the right one. We could not communicate with the plcso were going to wait for chuck he was out sick, but we took part moved them around and discussed what we would due in further dates.

Thursday: 1/31/19 we angled things different we discussed what color we would paint the wood . we tried different problems with the robot and how and what we would do with it and the angles it moves in, we are still trying to see what we will do with that robot and chuck was still out sick !so were still waiting for the plc
djean0001
Posts: 56
Joined: Tue Sep 12, 2017 1:38 pm

Re: Week #2: (1/28-2/1) Progress Reports

Post by djean0001 »

This is my progress report for the first meeting.
Attachments
2019 Project Schedule.pdf.docx
(1.02 MiB) Downloaded 167 times
djean0001
Posts: 56
Joined: Tue Sep 12, 2017 1:38 pm

Re: Week #2: (1/28-2/1) Progress Reports

Post by djean0001 »

Details about the work for the day.

On Tuesday, Jan/29/19 Our group deconstructed and moved our project onto its new table(resting area). We helped clean out the spare room. We attempted to communicate with the PLC to try and pull the program out of it, but we were not successful yet. Lastly we discussed a few different tasks and mentioned who would be doing each task to realize the project.

And on Thursday, Jan/31/19 We as a group, we rearranged our design on the table, to accommodate our audience. This move would allow the viewers/audience to be able to press buttons on the HMI. We ran into a slight problem with the Dobot gripper, so we did some research and came up with a bracket idea that would allow us to mount it differently, hopefully giving us a solution to this issue. We broke off individually to work on our schedule, and do any more research we needed to do. HERE IS A LINK TO SCHEDULE ROUGH DRAFT.