Week #4: (2/11-15) Progress Reports.

Post Reply
rjagodowski
Posts: 2370
Joined: Fri Sep 04, 2015 6:59 pm

Week #4: (2/11-15) Progress Reports.

Post by rjagodowski »

Post your Progress Reports for Week #4 as a Reply to this Topic.
crlapan
Posts: 56
Joined: Tue Sep 12, 2017 10:19 am

Re: Week #4: (2/11-15) Progress Reports.

Post by crlapan »

Thurs 2/14 A lot of progress was made in effort to get everyone on the same page. We shaved off some material on our parts to allow for robot grip to grip the part easier. The 3d printed part is doing well and we got the parts to start assembling the translation table few more things needed. wiring for all components discussed. Hope to have done in 2 weeks. Discussed major importance of having a flow chart made for our system operation.
almarafuga0001
Posts: 60
Joined: Fri Sep 15, 2017 9:18 am

Re: Week #4: (2/11-15) Progress Reports.

Post by almarafuga0001 »

Thursday 2/14/19 - Restarted with organizing the wires to make it look better by cutting a new hole to make the wires more neat and organized
ajfranqui0001
Posts: 54
Joined: Mon Sep 25, 2017 10:29 am

Re: Week #4: (2/11-15) Progress Reports.

Post by ajfranqui0001 »

Thursday 2\14\19 - Organizing the wires and cutting a new hole for the wires to go in.
ctboutin0001
Posts: 63
Joined: Mon Sep 18, 2017 9:18 am

Re: Week #4: (2/11-15) Progress Reports.

Post by ctboutin0001 »

This week we reorganized all the wiring to make everything flow and look better. We also shaved some of the blocks so te robot could grab them better.
rgomez0001
Posts: 42
Joined: Tue Sep 11, 2018 12:50 pm

Re: Week #4: (2/11-15) Progress Reports.

Post by rgomez0001 »

This week, We looked over the wiring and plc's to make sure everything was connected in the right ports, and that things would be running smoothly also began planning to adjust translation table.
Post Reply

Return to “Weekly Progress Reports - Warehouse Storage/Retrieval”