Week #4: (2/11-15) Progress Reports.
-
- Posts: 2383
- Joined: Fri Sep 04, 2015 6:59 pm
Week #4: (2/11-15) Progress Reports.
Post your Progress Reports for Week #4 as a Reply to this Topic.
Re: Week #4: (2/11-15) Progress Reports.
Thurs 2/14 A lot of progress was made in effort to get everyone on the same page. We shaved off some material on our parts to allow for robot grip to grip the part easier. The 3d printed part is doing well and we got the parts to start assembling the translation table few more things needed. wiring for all components discussed. Hope to have done in 2 weeks. Discussed major importance of having a flow chart made for our system operation.
-
- Posts: 60
- Joined: Fri Sep 15, 2017 9:18 am
Re: Week #4: (2/11-15) Progress Reports.
Thursday 2/14/19 - Restarted with organizing the wires to make it look better by cutting a new hole to make the wires more neat and organized
-
- Posts: 54
- Joined: Mon Sep 25, 2017 10:29 am
Re: Week #4: (2/11-15) Progress Reports.
Thursday 2\14\19 - Organizing the wires and cutting a new hole for the wires to go in.
-
- Posts: 63
- Joined: Mon Sep 18, 2017 9:18 am
Re: Week #4: (2/11-15) Progress Reports.
This week we reorganized all the wiring to make everything flow and look better. We also shaved some of the blocks so te robot could grab them better.
-
- Posts: 42
- Joined: Tue Sep 11, 2018 12:50 pm
Re: Week #4: (2/11-15) Progress Reports.
This week, We looked over the wiring and plc's to make sure everything was connected in the right ports, and that things would be running smoothly also began planning to adjust translation table.