Week #3: Observing Gate Operation with Pulse Waveforms.
-
- Posts: 2380
- Joined: Fri Sep 04, 2015 6:59 pm
Week #3: Observing Gate Operation with Pulse Waveforms.
The lab is attached below. A printed copy will be available for you in lab.
Make sure you put a description under each of your pictures describing the conditions of the screenshot. For Example: Inverter, AND Gate with Switch = 0, AND Gate with Switch = 1, etc.
Here is the Whiteboard pic from the 2020 Fall lab class (Just look at the Red Marker showing the TTL signals. Ignore the stuff about op-amps and comparators.):
Make sure you put a description under each of your pictures describing the conditions of the screenshot. For Example: Inverter, AND Gate with Switch = 0, AND Gate with Switch = 1, etc.
Here is the Whiteboard pic from the 2020 Fall lab class (Just look at the Red Marker showing the TTL signals. Ignore the stuff about op-amps and comparators.):
-
- Posts: 62
- Joined: Thu Sep 08, 2022 3:24 pm
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
210 Lab
- Attachments
-
- 210 L Week 3 Sign Off.png (618.75 KiB) Viewed 1691 times
-
- LAB 3 A #1.png (25.25 KiB) Viewed 1691 times
-
- LAB 3 B #1.png (26.51 KiB) Viewed 1691 times
-
- LAB 3 B #2.png (25.39 KiB) Viewed 1691 times
-
- LAB 3 C #1.png (23.59 KiB) Viewed 1691 times
-
- LAB 3 C #2.png (23.53 KiB) Viewed 1691 times
-
- LAB 3 D #1.png (24.76 KiB) Viewed 1691 times
-
- LAB 3 D #2.png (24.48 KiB) Viewed 1691 times
-
- LAB 3 E #1.png (24.28 KiB) Viewed 1691 times
-
- LAB 3 E #2.png (24.07 KiB) Viewed 1691 times
-
- LAB 3 F #1.png (24.29 KiB) Viewed 1691 times
-
- LAB 3 F #2.png (24.3 KiB) Viewed 1691 times
-
- Posts: 59
- Joined: Tue Nov 09, 2021 9:12 am
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
1. NOT Gate
2. AND Gate (ON)
3. AND Gate (OFF)
4. XOR Gate (ON)
5. XOR Gate (OFF)
2. AND Gate (ON)
3. AND Gate (OFF)
4. XOR Gate (ON)
5. XOR Gate (OFF)
- Attachments
-
- NOT Gate.png (25.53 KiB) Viewed 1690 times
-
- AND Gate (ON).png (23.9 KiB) Viewed 1690 times
-
- AND Gate (OFF).png (23.39 KiB) Viewed 1690 times
-
- XOR Gate (ON).png (25.92 KiB) Viewed 1690 times
-
- XOR Gate (OFF).png (25.78 KiB) Viewed 1690 times
-
- Posts: 54
- Joined: Fri Sep 16, 2022 5:19 pm
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
Evan Medina
EET-210 Lab 3
EET-210 Lab 3
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
week 3
- Attachments
-
- IMG_4449.jpg (2.14 MiB) Viewed 1677 times
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
Week 3 Vincent + Ihsan
- Attachments
-
- Inverter
- Inverter.png (24.38 KiB) Viewed 1676 times
-
- AND Switch = 0
- AND_SW0.png (24.21 KiB) Viewed 1676 times
-
- AND Switch = 1
- AND_SW1.png (24.85 KiB) Viewed 1676 times
-
- XOR Switch = 0
- XOR_SW0.png (25.47 KiB) Viewed 1676 times
-
- XOR Switch = 1
- XOR_SW1.png (25.47 KiB) Viewed 1676 times
-
- Posts: 65
- Joined: Fri Sep 10, 2021 2:30 pm
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
Jorge Vicenty
Lab # 3
Lab # 3
- Attachments
-
- 2022-10-02_115748.jpg (1.21 MiB) Viewed 1668 times
-
- and1.png (26.56 KiB) Viewed 1668 times
-
- nand0.png (26.29 KiB) Viewed 1668 times
-
- nor1.png (26.13 KiB) Viewed 1668 times
-
- or2.png (26.06 KiB) Viewed 1668 times
-
- or3.png (26.55 KiB) Viewed 1668 times
-
- Posts: 65
- Joined: Thu Sep 08, 2022 10:49 pm
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
These are the pics for the week 3 lab.
- Attachments
-
- IMG-5511.jpg (2.74 MiB) Viewed 1662 times
-
- IMG-5508 (1).jpg (2.73 MiB) Viewed 1662 times
-
- IMG-5506.jpg (2.91 MiB) Viewed 1662 times
-
- Posts: 44
- Joined: Fri Sep 06, 2019 9:43 am
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
1. Not
2. And off
3. And on
4. Xor on
5. Xor off
2. And off
3. And on
4. Xor on
5. Xor off
- Attachments
-
- 92E820DB-F8DF-4E14-98FF-E2EB312B1E9C.jpeg (3.09 MiB) Viewed 1640 times
-
- scope_17.png (24.35 KiB) Viewed 1640 times
-
- scope_18.png (24.08 KiB) Viewed 1640 times
-
- scope_14.png (24.81 KiB) Viewed 1640 times
-
- scope_8.png (25.02 KiB) Viewed 1640 times
-
- scope_11.png (25.55 KiB) Viewed 1640 times
-
- Posts: 63
- Joined: Thu Sep 23, 2021 9:12 am
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
Week 3
- Attachments
-
- Week3.pdf
- (632.63 KiB) Downloaded 41 times
-
- scope_25.png (25.1 KiB) Viewed 1367 times
-
- scope_29.png (25.11 KiB) Viewed 1367 times
-
- scope_30.png (24.7 KiB) Viewed 1367 times
-
- scope_31.png (25.53 KiB) Viewed 1367 times
-
- scope_33.png (25.41 KiB) Viewed 1367 times
-
- Posts: 35
- Joined: Tue Sep 06, 2022 11:55 am
Re: Week #3: Observing Gate Operation with Pulse Waveforms.
~Nathan Futrell