Week #12 (4/8-12): Progress Reports

Post Reply
rjagodowski
Posts: 2393
Joined: Fri Sep 04, 2015 6:59 pm

Week #12 (4/8-12): Progress Reports

Post by rjagodowski »

Please post your progress for Week #12 as a Reply to this Topic.
smfrechette2201
Posts: 55
Joined: Sun Nov 26, 2023 2:55 pm

Re: Week #12 (4/8-12): Progress Reports

Post by smfrechette2201 »

The 3D printed claw doesn't fit perfectly on the Fanuc, so I put some texture tape on each end of the gripper and pushed the ends of the claw over each side. It fits snug but unfortunately one side snapped while trying to remove extra tape on the claw. I worked with Genesis and Adrian.
a_cotto
Posts: 42
Joined: Wed Nov 08, 2023 11:56 am

Re: Week #12 (4/8-12): Progress Reports

Post by a_cotto »

plc was tested with dobot and functioned as intended
hmi display stand was made
dobot program was tweaked with the frame in place
fanuc claw needs new prototype (waiting on new ones)
whenry0001
Posts: 52
Joined: Thu Dec 14, 2023 9:58 am

Re: Week #12 (4/8-12): Progress Reports

Post by whenry0001 »

Played around with JST connections, ran PLC and HMI independent of PC
ggcabassacabrera2201
Posts: 23
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #12 (4/8-12): Progress Reports

Post by ggcabassacabrera2201 »

I worked with sam and adrien, we had issues with the claw and it broke, we went upstairs to ask if we could get another claw.