Week #2 (1/29-2/2): Progress Reports
-
- Posts: 2383
- Joined: Fri Sep 04, 2015 6:59 pm
Week #2 (1/29-2/2): Progress Reports
Please post your progress for Week #2 as a Reply to this Topic.
-
- Posts: 51
- Joined: Sun Nov 26, 2023 2:55 pm
Re: Week #2 (1/29-2/2): Progress Reports
We decided to use a modified gumball machine to dispense the snacks. We are only planning on using one snack for now, unless we have extra time before May 1st. We finally agreed on how the drink side of it is going to work. We started thinking about how long we think each task may take. We now know how we will be using hydraulics/pneumatics, the Fanuc, and the plc.
-
- Posts: 36
- Joined: Thu Dec 14, 2023 9:58 am
Re: Week #2 (1/29-2/2): Progress Reports
Discussed and trimmed down schemes for the device. Food dispensing plans have been reduced pending a functional system for one option. Suggested plans for drinks mixed by carbonating water, mixing with syrup and dispensing has been reduced to using a pump to dispense liquid from existing containers. I've gone in search of food-grade pump devices.
Re: Week #2 (1/29-2/2): Progress Reports
Figuring out the design of the machine
decided on two different sides.
figuring out ways to achieve the desired outcome.
decided on two different sides.
figuring out ways to achieve the desired outcome.
-
- Posts: 23
- Joined: Fri Sep 06, 2019 9:45 am
Re: Week #2 (1/29-2/2): Progress Reports
We discussed build ideas and smoothed out our plan to build the vending machine
-
- Posts: 16
- Joined: Wed Oct 04, 2023 11:47 am
Re: Week #2 (1/29-2/2): Progress Reports
We discussed on what days to have things done and we made separate "groups" to speed up our process group 1: snacks group 2: drinks