This week we got the gumball machine and figured out how to connect the servo. I was working with Eric and Genesis.
whenry0001
Posts: 36
Joined: Thu Dec 14, 2023 9:58 am

Re: Week #3 (2/5-10): Progress Reports

Post by whenry0001 »

Discussed issues with CO2 with Rick, and shelved it again pending more information. Brought in 3/8" hose, but may not end up using it.Was provided a bounty of 12VDC air pumps, as well as a smaller selection of liquid pumps. Air pumps have at least some 1/4" hose to work with and may be sufficient. Watched as the Dobot was made functional with linear rail. I looked into a batch file to make it easier to change the IP address on a computer to deal with the PLC when it keeps resetting to random 169 addresses, or if the PLC computer needs to connect to the network.
a_cotto
Posts: 42
Joined: Wed Nov 08, 2023 11:56 am

Re: Week #3 (2/5-10): Progress Reports

Post by a_cotto »

decided on teams last week and i was put into the drink team with Will and Jacob
decided to not go with the carbonation setup and went with a simpler approach of just using air pumps into two-liter bottles to dispense the liquids.
decided on the setup of the whole machine.
ggcabassacabrera2201
Posts: 16
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #3 (2/5-10): Progress Reports

Post by ggcabassacabrera2201 »

I worked with Sam and Erick, and we took apart the gumball machine figuring out how to use the servo with the gumball machine.
jmszczygiel0001
Posts: 23
Joined: Fri Sep 06, 2019 9:45 am

Re: Week #3 (2/5-10): Progress Reports

Post by jmszczygiel0001 »

discussed the setup of the drink dispenser and we scrapped the carbonation idea as its too much time for very little payoff