Week #6 (2/26-3/1): Progress Reports

Post Reply
rjagodowski
Posts: 2383
Joined: Fri Sep 04, 2015 6:59 pm

Week #6 (2/26-3/1): Progress Reports

Post by rjagodowski »

Please post your progress for Week #6 as a Reply to this Topic.
smfrechette2201
Posts: 51
Joined: Sun Nov 26, 2023 2:55 pm

Re: Week #6 (2/26-3/1): Progress Reports

Post by smfrechette2201 »

I made and tested a prototype of a food trough with Genesis. I helped Adrian test his prototype as well. I started the Fanuc program.
ggcabassacabrera2201
Posts: 16
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by ggcabassacabrera2201 »

Sam and I did a slide "tester" to see if food would dispense without getting stuck.
a_cotto
Posts: 42
Joined: Wed Nov 08, 2023 11:56 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by a_cotto »

finished the programming for the food dispensers. it works as it should but not at the same time for some reason after one servo moves theres a slight pulse that is picked up by the other servo. This will cause issues with repeatability and needs to be situated.
started to see how the track on the do bot functions and try to see how the i/o ports work on it as well.
finalized the idea for the food dispensing shoot and Eric had made a seocnd prototype that seem to work better than the first.
got to start working on the programming for the dobot
ggcabassacabrera2201
Posts: 16
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by ggcabassacabrera2201 »

Sam and I did a "test" to see if the food would dispense without getting stuck.
ggcabassacabrera2201
Posts: 16
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by ggcabassacabrera2201 »

Sam and I did a "test" to see if the food would dispense without getting stuck.
jmszczygiel0001
Posts: 23
Joined: Fri Sep 06, 2019 9:45 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by jmszczygiel0001 »

discussed the fanuc and how to go about using the claw i also did some research about 3d printing
whenry0001
Posts: 36
Joined: Thu Dec 14, 2023 9:58 am

Re: Week #6 (2/26-3/1): Progress Reports

Post by whenry0001 »

Mostly completed HMI lock in of variables, mostly completed drink dispensing portion of PLC, outlined overall program
Post Reply