Post your progress reports for Week #14 here.
whenry0001
Posts: 52
Joined: Thu Dec 14, 2023 9:58 am

Re: Week #14 (4/22-26): Progress Reports.

Post by whenry0001 »

Sourced CAT5e for more flexibility with Dobot motion. Wired new JST connectors. Dobot interfaces with HMI and PLC and sends signal.
Made Fanuc IO functional
smfrechette2201
Posts: 61
Joined: Sun Nov 26, 2023 2:55 pm

Re: Week #14 (4/22-26): Progress Reports.

Post by smfrechette2201 »

Chuck helped me with the Fanuc program, I got it working good but we only had half the claw on while testing it. We got another printed but the size is off so it won't work with the one remaining side. The claw no longer grabs the cup. The program will probably need to be adjusted when we get the claw to work. Rick brought in his hole saw kit so I was able to drill the holes in the plywood. Adrian got the 3D printer working and printed more claws, so I put them on the Fanuc and almost got it to grab the cup. The claw shifts when it hits the cup so I will need to fix that somehow.
Last edited by smfrechette2201 on Fri May 03, 2024 1:40 pm, edited 1 time in total.
ggcabassacabrera2201
Posts: 24
Joined: Wed Oct 04, 2023 11:47 am

Re: Week #14 (4/22-26): Progress Reports.

Post by ggcabassacabrera2201 »

The claw broke once more so we got another one hopeful that it wont break
a_cotto
Posts: 54
Joined: Wed Nov 08, 2023 11:56 am

Re: Week #14 (4/22-26): Progress Reports.

Post by a_cotto »

got the makerbot working and the stl file was obtained
printed out two extra sets of prototypes
thinking of maybe 3d printing a nozzle instead of having hoses hanging out of the wood structure.