Week #6 & #7: (10/7-18) Boebot #2 & #3
-
- Posts: 2383
- Joined: Fri Sep 04, 2015 6:59 pm
Week #6 & #7: (10/7-18) Boebot #2 & #3
You should continue working on your Boebot. You should complete Chapter 3 (including Table 3-1 and its graph) and begin working in Chapter 4. Remember to do the exercises at the end of each chapter.
NOTE: You do NOT have to create the Excel sheet yourself. Just download the file attached below.
Table 3-1 on page 97 of the text has you collect data points so that you can create a graph of the Rotational Velocity of the Servo Motors versus the Pulse Width of the servo control signal. The attached Excel file should facilitate your graphing. Download this file and open it in Excel (is on our computers in 20/M118). Complete the RPM values from the table you completed in your text and you should automatically see the data points appear on the graph as you complete the table. Remember that according to the text, clockwise (CW) is negative and counter-clockwise (CCW) is positive.
Create your graph using the Excel spreadsheet given above and post your data graph as a reply to this topic. A sample post and instructions will be given as a Reply below.
NOTE: If you don't have Excel on your home computer, it is part of the MIcroSoft Office suite of products, which is available in numerous packages, including a student version. It is a pay product. A "free" alternative is LibreOffice and is available for free download for Windows, Mac & Linux operating systems. It is probably about 99% compatible with MS Office, though there are occasion differences. Considering it's cost (free) it's a great competitor to the MS Office and fits nicely into limited budgets. The Word processor is called Writer and the Spreadsheet is called Calc.
NOTE: You do NOT have to create the Excel sheet yourself. Just download the file attached below.
Table 3-1 on page 97 of the text has you collect data points so that you can create a graph of the Rotational Velocity of the Servo Motors versus the Pulse Width of the servo control signal. The attached Excel file should facilitate your graphing. Download this file and open it in Excel (is on our computers in 20/M118). Complete the RPM values from the table you completed in your text and you should automatically see the data points appear on the graph as you complete the table. Remember that according to the text, clockwise (CW) is negative and counter-clockwise (CCW) is positive.
Create your graph using the Excel spreadsheet given above and post your data graph as a reply to this topic. A sample post and instructions will be given as a Reply below.
NOTE: If you don't have Excel on your home computer, it is part of the MIcroSoft Office suite of products, which is available in numerous packages, including a student version. It is a pay product. A "free" alternative is LibreOffice and is available for free download for Windows, Mac & Linux operating systems. It is probably about 99% compatible with MS Office, though there are occasion differences. Considering it's cost (free) it's a great competitor to the MS Office and fits nicely into limited budgets. The Word processor is called Writer and the Spreadsheet is called Calc.
-
- Posts: 2383
- Joined: Fri Sep 04, 2015 6:59 pm
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Here are sample tables from the Excel File provided above. Your numbers should be different!
-
- Posts: 44
- Joined: Fri Sep 06, 2019 9:43 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
servo rpm
- Attachments
-
- servo rpm 1.PNG (22.62 KiB) Viewed 11130 times
-
- servo rpm 2.PNG (21.98 KiB) Viewed 11130 times
-
- Posts: 30
- Joined: Fri Sep 06, 2019 9:47 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
servo rpm
- Attachments
-
- Boe Bot graph.PNG (22.31 KiB) Viewed 11126 times
-
- Boe bot table.PNG (21.33 KiB) Viewed 11126 times
-
- Posts: 36
- Joined: Wed Sep 04, 2019 10:05 am
-
- Posts: 7
- Joined: Fri Sep 06, 2019 9:44 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Alex Morley's servos. Don't worry too much over my speeds. I have different servos.
- Attachments
-
- Capture.PNG (18.72 KiB) Viewed 11088 times
-
- Capture2.PNG (16.09 KiB) Viewed 11088 times
-
- Posts: 27
- Joined: Fri Sep 06, 2019 9:43 am
-
- Posts: 1
- Joined: Thu Oct 17, 2019 2:13 pm
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
servo
- Attachments
-
- GRAPH.PNG (23.31 KiB) Viewed 11064 times
-
- CHART.PNG (28.19 KiB) Viewed 11064 times
-
- Posts: 1
- Joined: Fri Sep 06, 2019 9:45 am
-
- Posts: 1
- Joined: Fri Sep 13, 2019 10:18 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
My graph and Table
- Attachments
-
- chartCapture.PNG (22.29 KiB) Viewed 11017 times
-
- graphCapture.PNG (31.6 KiB) Viewed 11017 times
-
- Posts: 48
- Joined: Tue Sep 18, 2018 6:10 pm
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Graph and table
- Attachments
-
- Capture.PNG (21.37 KiB) Viewed 11343 times
-
- pppp.PNG (24.86 KiB) Viewed 11343 times
-
- Posts: 38
- Joined: Fri Sep 06, 2019 9:46 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Graph and chart
- Attachments
-
- pic-1.PNG (24.28 KiB) Viewed 11338 times
-
- pic-2.PNG (17.02 KiB) Viewed 11338 times
-
- Posts: 1
- Joined: Fri Sep 06, 2019 9:49 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
graph and chart
- Attachments
-
- graph.PNG (15.45 KiB) Viewed 11334 times
-
- table.PNG (24.34 KiB) Viewed 11334 times
-
- Posts: 53
- Joined: Fri Jan 26, 2018 10:10 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Konnor Busiere
- Attachments
-
- Copy of Table 3-1 in BoeBot Text v15.1.xlsx
- (14.61 KiB) Downloaded 225 times
-
- Posts: 9
- Joined: Fri Sep 06, 2019 9:47 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Nathan matos
- Attachments
-
- snip screen shot.PNG (81.73 KiB) Viewed 11322 times
Last edited by nlmatos0001 on Fri Dec 06, 2019 10:52 am, edited 2 times in total.
-
- Posts: 9
- Joined: Fri Sep 06, 2019 9:47 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Nathan matos
- Attachments
-
- Capture.PNG (28.77 KiB) Viewed 11321 times
-
- Posts: 9
- Joined: Fri Sep 06, 2019 9:47 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Nathan matos
- Attachments
-
- Capture.PNG 2.PNG (24.9 KiB) Viewed 11321 times
-
- Posts: 19
- Joined: Fri Sep 06, 2019 3:03 pm
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Keith Ashley
- Attachments
-
- graph keith.PNG (26.04 KiB) Viewed 11320 times
-
- numbers graph keith.PNG (26.42 KiB) Viewed 11320 times
-
- Posts: 20
- Joined: Fri Sep 06, 2019 9:51 am
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
graph
- Attachments
-
- boe bot table.png (35.78 KiB) Viewed 11319 times
-
- boe bot graph.png (32.94 KiB) Viewed 11319 times
-
- Posts: 1
- Joined: Thu Dec 19, 2019 3:04 pm
Re: Week #6 & #7: (10/7-18) Boebot #2 & #3
Graph
- Attachments
-
- 1st Graph.PNG (15.56 KiB) Viewed 11208 times
-
- 2nd Graph.PNG (11.54 KiB) Viewed 11208 times